free CPCS rt 05 mock test 15 questions touch screen nocn renewal blue card test

RT05 Dragline | CPCS Blue Card Renewal | FREE Mock Test | 15 Questions

This resource offers a complimentary mock test designed for renewing the RT05 Dragline CPCS Blue Card, featuring practice questions and their corresponding answers to aid in preparation for the renewal assessment.

CPCS Renewal pass mark: 12 out of 15 Questions

Test Time: 15 minutes

Download Full RT05 Practice Test (105 Questions)

Ace the CPCS RT05 Dragline Blue Card Renewal Test with 105 Expert-Crafted Practice Questions

 

Prepare yourself for success in the CPCS RT05 Dragline Blue Card Renewal Test with this comprehensive PDF file containing 105 expertly crafted practice questions and answers.

Developed by industry professionals at cardrenewaltest.co.uk, this mock test covers all critical aspects of dragline operations, including preparation, safety protocols, stability considerations, and study checklists.

 

Did you find this useful?

Average rating 5 / 5. Vote count: 26

No votes so far! Be the first to rate this post.

  1. Why is it important for draglines used in severe conditions to undergo more regular thorough examinations?

 

  1. A) To meet regulatory standards
  2. B) To reduce costs associated with maintenance
  3. C) To maintain resale value
  4. D) To ensure continued operational safety and reliability

 

**Correct Answer: D) To ensure continued operational safety and reliability**

 

  1. What potential consequence might arise from a large volume of quickly draining water from the dragline’s bucket?

 

  1. A) Enhanced stability in operation
  2. B) Potential water contamination
  3. C) Reduced sediment or material loss
  4. D) Material loss from the bucket

 

**Correct Answer: D) Material loss from the bucket**

 

  1. What is the primary concern regarding excessive throw beyond the vertical position in excavating operations?

 

  1. A) Improved stability during loading
  2. B) Risk of overloading the bucket
  3. C) Reduction in wear and tear on the machine
  4. D) Inefficiency in bucket loading

 

**Correct Answer: D) Inefficiency in bucket loading**

 

  1. What potential consequence might occur if the bucket encounters substantial resistance during dredging in the side-on position?

 

  1. A) Improved digging efficiency
  2. B) Decreased wear and tear on the bucket
  3. C) Risk of the dragline being pulled towards the bucket and over the edge
  4. D) Enhanced stability in operation

 

**Correct Answer: C) Risk of the dragline being pulled towards the bucket and over the edge**

 

  1. What purpose does maintaining a safe distance from power lines serve in the context of the dragline’s operation?

 

  1. A) To prevent interference with data signals
  2. B) To reduce potential environmental hazards
  3. C) To ensure uninterrupted power supply
  4. D) To minimize the risk of electric discharge or arcing

 

**Correct Answer: D) To minimize the risk of electric discharge or arcing**

 

  1. What condition or requirement enables operators to conduct the more detailed weekly checks?

 

  1. A) Specific authorization from the manufacturer
  2. B) Completion of a basic certification course
  3. C) Regular equipment usage for over a year
  4. D) Additional training for the checks required for that model of dragline

 

**Correct Answer: D) Additional training for the checks required for that model of dragline**

 

  1. What can cause additional stress on the hoist rope during excavation?

 

  1. A) Optimal operational conditions
  2. B) Side-to-side movement of the bucket
  3. C) Effective digging techniques
  4. D) Excessive throw beyond the vertical position

 

**Correct Answer: D) Excessive throw beyond the vertical position**

 

  1. What is the effect of slewing rapidly with a loaded bucket?

 

  1. A) Improved stability on the boom
  2. B) Reduced stress on the hoist rope
  3. C) Higher levels of side stress on the boom
  4. D) Enhanced operational speed

 

**Correct Answer: C) Higher levels of side stress on the boom**

 

  1. Why is it crucial to check ground conditions in relation to the bearing pressure applied through each track in a dragline operation?

 

  1. A) To improve the dragline’s speed
  2. B) To reduce the risk of bearing damage
  3. C) To prevent the machine’s sinking or exceeding track width
  4. D) To ensure a smoother ride for the operator

 

**Correct Answer: C) To prevent the machine’s sinking or exceeding track width**

 

  1. What factor influences the variation in bearing pressure on each part of the tracks in a dragline operation?

 

  1. A) Operator’s experience level
  2. B) Configuration of the dragline
  3. C) Soil moisture content
  4. D) Color of the machine’s exterior

 

**Correct Answer: B) Configuration of the dragline**

 

  1. What potential impact does a forward tilt while operating near the bank have on a dragline’s stability?

 

  1. A) Improved stability
  2. B) Increased operational radius
  3. C) Potential further instability
  4. D) Enhanced digging efficiency

 

**Correct Answer: C) Potential further instability**

 

  1. What happens to a dragline’s center of gravity while traveling across a slope?

 

  1. A) It remains constant
  2. B) It shifts towards the uphill side
  3. C) It moves towards the downhill side
  4. D) It varies randomly

 

**Correct Answer: C) It moves towards the downhill side**

 

  1. What is the primary concern associated with gusts of wind, even if the overall wind speeds remain within the machine’s specified limit?

 

  1. A) Increased noise levels at the work site
  2. B) Reduced visibility for the operator
  3. C) Potential impact on adjacent structures
  4. D) Handling challenges for the boom and/or dragline bucket

 

**Correct Answer: D) Handling challenges for the boom and/or dragline bucket**

 

  1. What is the particular concern regarding the dragline’s movement when dredging side-on to the tracks along the bank?

 

  1. A) Increased stability in operation
  2. B) Potential damage to the surrounding area
  3. C) Minimal risk of imbalance
  4. D) The risk of the machine being pulled towards the bucket and over the edge

 

**Correct Answer: D) The risk of the machine being pulled towards the bucket and over the edge**

 

  1. Why is it important for the operator to consider changes in ground conditions during dragline operations?

 

  1. A) To accelerate the excavation process
  2. B) To reduce fuel consumption
  3. C) To prevent potential instability and maintain machine safety
  4. D) To enhance the machine’s maneuverability

 

**Correct Answer: C) To prevent potential instability and maintain machine safety**

CPCS Blue Card Renewal practice questions for all modules!

Simply scroll down to find yours 

 

(1) Original price was: £15.00.Current price is: £9.95.
(1) Original price was: £15.00.Current price is: £9.95.
(1) Original price was: £15.00.Current price is: £9.95.
(3) Original price was: £15.00.Current price is: £9.95.
(3) Original price was: £15.00.Current price is: £9.95.
(2) Original price was: £15.00.Current price is: £9.95.
(2) Original price was: £15.00.Current price is: £9.95.
(6) Original price was: £15.00.Current price is: £9.95.
(5) Original price was: £15.00.Current price is: £9.95.
(4) Original price was: £15.00.Current price is: £9.95.
(3) Original price was: £15.00.Current price is: £9.95.
(1) Original price was: £15.00.Current price is: £9.95.
(1) Original price was: £15.00.Current price is: £9.95.
(6) Original price was: £15.00.Current price is: £9.95.
(1) Original price was: £15.00.Current price is: £9.95.
(4) Original price was: £15.00.Current price is: £9.95.
Original price was: £15.00.Current price is: £9.95.
Original price was: £15.00.Current price is: £9.95.
(2) Original price was: £15.00.Current price is: £9.95.
(1) Original price was: £15.00.Current price is: £9.95.
Original price was: £15.00.Current price is: £9.95.
Original price was: £15.00.Current price is: £9.95.
(2) Original price was: £15.00.Current price is: £9.95.
(2) Original price was: £15.00.Current price is: £9.95.
(3) Original price was: £15.00.Current price is: £9.95.
(7) Original price was: £15.00.Current price is: £9.95.
(1) Original price was: £15.00.Current price is: £9.95.
(8) Original price was: £15.00.Current price is: £9.95.
(2) Original price was: £15.00.Current price is: £9.95.
(2) Original price was: £15.00.Current price is: £9.95.
(2) Original price was: £15.00.Current price is: £9.95.
(1) Original price was: £15.00.Current price is: £9.95.
(2) Original price was: £15.00.Current price is: £9.95.
(7) Original price was: £15.00.Current price is: £9.95.
(1) Original price was: £15.00.Current price is: £9.95.
(2) Original price was: £15.00.Current price is: £9.95.
(3) Original price was: £15.00.Current price is: £9.95.
(2) Original price was: £15.00.Current price is: £9.95.
(3) Original price was: £15.00.Current price is: £9.95.